Gypsum Plaster Powder Making Machinery China Gypsum Powder Production Line

  • Gypsum Plaster Powder Making Machinery China Gypsum Powder Production Line

Gypsum Plaster Powder Making Machinery China Gypsum Powder Production Line

Gypsum Plaster Powder Making Machinery China Gypsum Powder Production Line
Gypsum Plaster Powder Making Machinery China Gypsum Powder Production Line

Gypsum Plaster Powder Making Machinery China Gypsum Powder Production Line

View All >
After-sales Service: Engineers available to service machinery overseas
Min Order Quantity: 1 Unit
Delivery Time:
In Stock (Within 7 days)
Production (Within15 to 20 days)
Customization (negociated delivery time)
After-sales Service:
1. It is recommended that you keep in touch with the seller after purchasing offline...
About after-sales service:
1. It is recommended that you keep in touch with the seller after purchasing offline, who knows your equipment and working conditions and can provide you with more effective after-sales service.

2. If you purchase on Machmall.com, its customer management system will record your customer information, please rest assured to apply for after-sales service.

3. If you can't find the seller, Machmall.com will help you as long as you provide the equipment nameplate and service you want. Please inform us as much information as possible in order to get the most accurate after-sales service.

After-sales service forms:
1. Online service: samples, technical specifications, operation manuals, spare parts purchase.

2. Video service: application guidance, troubleshooting and maintenance guidance.

3. Overseas service: XCMG has a complete global after-sales service team. Please note that if there is no clear after-sales liability clause in the sales contract, we will charge the necessary service fees.
Gypsum Plaster Powder Making Machinery China Gypsum Powder Production Line

Content:

Or choose from these questions:
What is the best price you can offer?
Do you support customization?
What is the MOQ for this product?

*Email:

Full Name:

Mobile phone:

Specs & Compare
Details

Specifications

  • Weight:1.000kg
  • Warranty Period:3 Months
  • Condition:New

Packaging & Shipping

  • Delivery Lead Time:7 days for ready goods
  • Minimum Order:1 Piece
  • Supply Ability:10,000 Set/ Sets per Month
  • Total Quantity In Stock:Over 5000
  • Delivery Port:Any Port In China

Controlling Part

Full Automatic / Semi-Automatic

Annual capacity

Customized (20, 000-300, 000 Tons Per Year)

Calcining system

Ebullition furnace

Rotary kiln

Fuel

Natural gas, diesel, coal, heavy oil

Raw material

Natural Gypsum Rock (Content of CaSO4.2H2O >80%.)
Desulfurization Gypsum
Dephosphorization Gypsum

Finished powder usage

Gypsum board

Plaster powder

Setting time

The Initial Setting Time: Shall Not Be Less Than 6 Minutes,
The Final Setting Time: Shall Not Be More Than 30 Minutes

 Gypsum Plaster Powder Making Machinery China Gypsum Powder Production LineGypsum Plaster Powder Making Machinery China Gypsum Powder Production LineGypsum Plaster Powder Making Machinery China Gypsum Powder Production Line
1. Gypsum powder quality standard: in compliance with GB/T 9776-2008 
2. Main Technology(here take Nature gypsum rock as example)
Gypsum rock - first crushing -second crushing - grinding - calcining - aging -finished products (CaSO4.1/2H2O)

After being heated and calcined with certain temperature,natural dihydrate gypsum is dehydrated and decompounded,to get the product whose major component is semi-hydrated gypsum(CaSO4.1/2H2O),that is,calained gypsum(generally slaked gypsum).According to different temperatures and pressure conditions during dehydration decomposition,the obtained product is  β-Type calcined gypsum.Basic process of mechanized prouduction includes five large systems:gypsum grinding,automatic measuring system,calcination system,heat supply system,and aging&packing system.According to client's requirement,gypsum crushing system can be added to crush large gypsum rock to be with size of 0-30mm,and then conveyed into grinding system.

3.Payment conditions:
A.  Payment terms: 30% T/T in advance; 70%L/C or T/T
B. We can provide quality guarantee;
C. Kunlun bank account available to make convenient for Iranian client
Gypsum Plaster Powder Making Machinery China Gypsum Powder Production LineGypsum Plaster Powder Making Machinery China Gypsum Powder Production LineGypsum Plaster Powder Making Machinery China Gypsum Powder Production LineGypsum Plaster Powder Making Machinery China Gypsum Powder Production LineGypsum Plaster Powder Making Machinery China Gypsum Powder Production Line

National Standard of Calcined Gypsum
Standard No.: GB/T 9776-2008
Scope of application:
Gelled material made by dehydrating natural gypsum(raw material). Its main component isβ-GaSO4·1/2H2O, without any admixture or additive.
   The natural gypsum should be in conformity with requirements of "gypsum rock(JC/T700) for making cementing material" gypsum rock of Grade 3 or more higher grades.
 
Classification:
It is classified to be three grades: 3.0,2.0,and 1.6 according to its 2h strength(breaking strength).
 
Composition:  
β-GaSO4·1/2H2O content(mass fraction) in Calcined gypsum should be not less than 60.0%.

Physical and chemical performance:  

Grade

Fineness(Screen residue of 0.2mm square screen)/%

Setting time

2h strength/MPa

First setting

Final setting

Breaking strength

Compression  strength

3.0

≤10

≥3

≤30

≥3.0

≥6.0

2.0

≥2.0

≥4.0

1.6

≥1.6

≥3.0

Note: 1Mpa=10.2kgf/cm2

Responsibility of Buyer and Seller
Prepared by Buyer
1.1 Machinery and tools for installation, commission and maintenance
1.2 Transportation tool:2 sets of forklifts
1.3 Power supply system
a. High-voltage power supply
b. Substation and distribution station
1.4. Water supply& storage and drainage system
1.5 Civil engineering: Building construction, equipment foundation(including pre-burying work), steel-concrete structure silos and pools.
1.6 Material used for making machine's platform and supporting frame of equipment
Provided by Buyer
2.1 Providing round-trip ticket and other transportation cost for the Seller's workers
2.2 Providing accommodation and all kinds of necessary extra charges for the Seller's workers during installation and commissioning and training period
2.3 Providing all necessary large tools for installation, such as crane, forklift, welder, acetylene& oxygen cutting machine, etc
2.4 Providing assistant workers to cooperate with the Seller's workers during installing according to the Seller's requirement
2.5 Usage permission for special equipment
Provided by Seller
2.1 Production equipment
2.2 Gypsum Board Production Line,
Providing installation guiding engineers and technical workers
2.3 Providing 1 team leaders and 1 interpreters
2.4 Providing equipment foundation drawings, general arrangement drawing of production line (layout plan, elevation drawing and side view drawing) within 40 days after receiving down payment
2.5 Providing equipments' operation manual during training
2.6 Providing main equipments' general assembly drawing, wiring diagram of control cabinets, PLC computer programs within 7 days after acceptance
2.7 The Seller is in charge of commissioning and training
a. Commissioning: the Seller shall send engineers and technical workers to plant site to do full-scale testing, and the Buyer shall also send assistant staff to cooperate with the Seller's people.
b. The Seller's workers in charge of commissioning will do performance operation, make on-site speeches and answer questions to Buyer's technicians and operation workers under training. During the whole process of testing, both sides shall work together. After Buyer's workers master operation technique, the Seller will hand over the whole running line to the Buyer's for operation and then the training work is finished.
2.8 Within one year after signing the Acceptance Certificate, the Seller shall provide technical consultation to the Buyer for free. If the Seller's people are asked to be on the site, the Buyer shall provide round-way tickets and accommodation abroad.

Environmental protection:
Main pollution sources:
Waste residue: Waste board and board edge cut down, etc.
Waste water: The sediment water left after the fan circulation use in the product process, from washing pool and toilet water.
Noise: mainly is 95Db(A)or so noise from the fan.
Dust: From mixing material and cutting board.
Disposal methods:
Waste residue and disposal: It does not pollute the environment and can be re-used afterreprocessing in gypsum powder production line.
Waste water and disposal: No industrial waste water. The living wastewater is drained into the plant sewage network, and the production wastewater from cleaning floor in the workshops can be recycled after the secondary sedimentation. And the water used in such equipment as fan can also be recycled.
Noise and deposition: Noise, which mainly comes from fan. Besides setting soft joints at the exhaust inlet and exhaust outlet. Set impedance complex mufflers at the exhaust outlet, which can low the noise as much as 30Db (A).
Dust and disposal: Dust collection devices will be equipped in the production process.

Labor sanitation
Safety design
Safety design for factory area
The factory road traffic design and outdoor fire hydrant arrangement will be in conformity with every requirement in "Achitectural Design Fire Prevention Norm"; The pavements and driveways are smooth, unblocked, and there are enough lighting facilities at night; Set covers over the draniage ditches in the factory; Make it easy to go through, discharge, convenient and safe; at the same time do virescence in the whole factory to reduce the dust and noises.
Safety design for workshop
In the workshop, certain safe distance must be left for the main passages and operating passages, between equipments and the building, between equipment and equipment, and between equipment and passages; Set guard rail on all workbench edges; Set covers over drainage ditches; Lighting is enough in the workshop; All electrical equipments have ground protection, and there is overhauling power of 36V to ensure of overhaul safety.
Harmful factor in producing:
Variety of harmful substance: Noises from fan, air compressor, etc.
Measures to reduce harmful factors: Do best to select low noise equipments to reduce the noise from sound source, and meanwhile add anti-vibration soft connectioner and muffler on the fan.
Precautionary measures of safety and sanitation
Protective appliances shall be allotted to each worker according to real working conditions; All equipment is managed by certain person, the detailed operational procedure shall be made. Workers on duty must carry on safety education and corresponding skills training; strictly operate according to operation procedure to ensure the person's security and equipment's good condition; Regularly carry on safety education to staff; Regularly organize safety inspecton to dispel the accident potential in time.
Explosionproof
Explosive materials are not produced and discharged in the production workshop of this project. There is no factor of explosion.
Fire fighting system
Our equipment is not easy to produce fireworks, so don't need any corresponding fire detection device.

After Sale Service

DCI is pleased to provide the parts,knowledge and expertise to assist with all your plant's maintenance and upgrade needs.We can supply as below:

Spare Parts:

All Rollers and Shafts
Mixer Parts
Forming Plate Parts
Saw Blades 
Forming Belts/Conveyor Belting
Carbon Bearings
Dryer Sprockets
Chain
Chain Guides
Head/Tail Pulleys
Plat Belt Drive Pulleys
Filter Bags

Raw Material
Modified Starch
Paper
Foaming Agent
Glue
Edge Tape
Fiberglass
White Tape

Technical Support

DCI's guarantee is within 1 year free after delivery and long-term service
DCI can help u to modify equipment and increase production capacity
DCI can help u solve any problems related to the gypsum equipment


DCI,the gypsum machinery expert,your best choice!

Send your message to this supplier:

Email:
to:
Hengshui Decheng Machinery Manufacturing Co., Ltd
Content:
/6000

Your inquiry content must be between 20 to 6000 characters.

Quantity:
/ Set
back to top
brand_img
Certified for 3 years
Rating
Response Time
24小时
Year of establishment
2008年
Add a Product
1 selected
Confirm

Related Products To Choose