WEIHUA Gantry Crane for Subway Construction
Specs & Compare
Details
Specifications
- Weight:2500.000kg
- Warranty Period:3 Months
- Condition:New
Packaging & Shipping
- Delivery Lead Time:7 days for ready goods
- Minimum Order:1 Piece
- Supply Ability:10,000 Set/ Sets per Month
- Total Quantity In Stock:Over 5000
- Delivery Port:Any Port In China
Product name: Gantry Crane for Subway Construction
Lifting weight: 16t-45/16t
Span: 18, 22, 26, 30m
Working Duty: A6
With the rapid development of the economy, population and the rapid growth of motor vehicles, many cities have emerged a serious 'urban disease' - a large traffic jam. Subways come into being. Because the subway is comfortable, fast and convenient, it is becoming an important parts of transport in many urban cities.
With the fast development of subways, the construction machines, especially the cranes, are becoming an important role for the subway construction. Weihua has rich experience and many project cases on subway construction gantry crane.
Subway gantry crane for slag handling is used for subway tunnel construction. This crane is mainly responsible for the construction of the subway tunnel, lifting the dregs excavated by shield excavator to the ground.
Features of subway slag gantry crane:
◆ variable span, improve crane utilization;
◆ cantilever detachable, more practical;
◆ running fast, high work duty, high efficiency;
◆ high lifting height;
◆ with special tilting spreader with automatically tipping.
1. The gantry crane for subway construction is used for dealing the dregs and site material handling during subway construction.
2. With the span-changed function of Min. step-length 100mm, this subway construction gantry crane is suitable for various working conditions.
3. The cantilever is detachable, also can preserve the cantilever interface which will be flexible for different working conditions.
4. There is lightning protection system, wind speed detection warning system.
5. The gantry crane for subway construction is equipped special spreader and realize the interchange of dregs bucket and the hook.
6. With the overturn hook, it realizes overturning the dregs at any position in the air. Overturning dregs system is controlled by the hydraulic which makes the overturning process more stable.
7. The trolley is rotatable, and can realize the front, side transporting dregs.
Certified for 3 years
Rating
Response Time
08:00-24:00
Year of establishment
1988
Add a Product
1 selected
Confirm