Techking DK22
Parts
Packaging & Shipping
Details
Specifications
- Weight:1.000kg
- Condition:New
Packaging & Shipping
- Delivery Lead Time:7 days for ready goods
- Minimum Order:1 Piece
- Delivery Port:Any Port In China
Longer tire life
deeper tread depth design
bigger block design can lower the risk of impact
sidewall protection ring could prevent the cutting on the sidewall efficiently
Better traction ability
by wider groove design
‘AGRI’ Compound Inside
Certified for 3 years
Rating
Response Time
24 hours
Year of establishment
2005
Add a Product
1 selected
Confirm